Cameroon (Mutengene)
Cameroon Baptist Convention Health Board
[project map]
Cameroon Baptist Hospital Expansion
October 14-24, 2005
eMi Project 5387
Original Project Scope
Currently, the Cameroon Baptist Convention Health Board operates across 6 of Cameroon’s 10 provinces with an extensive infrastructure of 2 hospitals, 29 health centers and 40 primary health centers.
This project would upgrade the existing Mutengene Baptist Health Center – operating in a single, existing 2-story building - from a 34-bed capacity health center to a fully functioning 200-bed general hospital.
Schematic building block designs and a site plan proposal have been developed in-house by Baptist Convention employees who have some degree of engineering or architecture background. These documents have been presented to eMi in a simple, black-and-white prospectus.
The Baptist Convention health board recognizes that they must engage the next step: significant fundraising. To that end, they have requested eMi’s help in reviewing, critiquing, fine-tuning, or redesigning their proposal and to then develop a fundraising packet using computer-generated models, renderings, or other effective and advanced graphics.
This is truly an opportunity for us to eMi to come along side a national ministry to assist them with our design skills – without us, they can’t effectively take the next step.
Will you help us help them to take the next step?
Project Team
Bob Smith - eMi Team Leader

