This site will look much better in a browser that supports web standards, but it is accessible to any browser or Internet device.
links link to project links link to contact us
Project Profile
Cameroon (Mutengene)
Cameroon Baptist Convention Health Board
[project map]
Cameroon Baptist Hospital Expansion
October 14-24, 2005
eMi Project 5387


Original Project Scope
Currently, the Cameroon Baptist Convention Health Board operates across 6 of Cameroon’s 10 provinces with an extensive infrastructure of 2 hospitals, 29 health centers and 40 primary health centers.

This project would upgrade the existing Mutengene Baptist Health Center – operating in a single, existing 2-story building - from a 34-bed capacity health center to a fully functioning 200-bed general hospital.

Schematic building block designs and a site plan proposal have been developed in-house by Baptist Convention employees who have some degree of engineering or architecture background. These documents have been presented to eMi in a simple, black-and-white prospectus.

The Baptist Convention health board recognizes that they must engage the next step: significant fundraising. To that end, they have requested eMi’s help in reviewing, critiquing, fine-tuning, or redesigning their proposal and to then develop a fundraising packet using computer-generated models, renderings, or other effective and advanced graphics.

This is truly an opportunity for us to eMi to come along side a national ministry to assist them with our design skills – without us, they can’t effectively take the next step.
Will you help us help them to take the next step?

Project Team
Bob Smith - eMi Team Leader
photo
Women in Mozambique
© 2005 Engineering Ministries International, USA. All rights reserved.